R-Tech I-CUT100P Guía de instalación Pagina 7

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 6
7
1- Once the linkage rod has been cut
to the proper length assemble the
linkage rod with heat shrink tubing
and the rubber end.
2- Slide the heat shrink tubing over the
rubber end as far as it will go.
3- Heat the shrink tubing with a heat gun (hair
dryer or small torch will work).
Begin by heating the rubber end rst. The
heat shrink is lined with adhesive and will
stick to the rubber when heat is applied.
4- Continue shrinking the tube to the rod until
secured. Be sure not to overheat the tubing
causing it to pull from the rubber end.
5
-
Once both sides of the linkage have been
nished secure the linkage to the sensor
and suspension.
69 Camaro Front 58-64 Impala Front
Triangulated 4-Link Rear
Rear Trailing Arm
65-70 Mustang Rear C-10 Truck Rear
Ride Height Sensors
Assembly of the LevelPRO Sensor Link Rods
Sensor Mounting Examples
Vista de pagina 6
1 2 3 4 5 6 7 8 9 10 11 12

Comentarios a estos manuales

Sin comentarios